Retour à l'article
 - 193.1 ko

5. Installation orientations for the Matelots-Mortemets sector,
approved on 24 November 2011 (p. 15). The extension of the
Mortemets lane to the D10 is outlined in red. The “public
transport liaisons” planned on the hillside of the Satory
plateau are outlined in yellow. The new departmental road
connecting Pion to Matelots can be seen in red.
It is connected at each end to the D7 and the D10.